首页> 外文期刊>International Journal of Production Research >A sequential consideration for assembly sequence planning and assembly line balancing using the connector concept
【24h】

A sequential consideration for assembly sequence planning and assembly line balancing using the connector concept

机译:使用连接器概念的装配顺序计划和装配线平衡的顺序考虑

获取原文
获取原文并翻译 | 示例
           

摘要

In an ever-changing era, fast responses in the research and development (R&D) of products should be made to satisfy the various needs of customers. The sequential consideration for assembly sequence planning and assembly line balancing can contribute to shrinking the gap between design and manufacturing. The so-called assembly sequence planning refers to a task in which planners arrange a specific assembly sequence according to the product design description as well as to their particular heuristics in assembling all the components of a product. Assembly line balancing is concerned with how to effectively arrange every assembly task so as to reach the highest efficiency and the shortest idling time in the total assembly line. In this study, connectors equipped with assembly engineering information (combination, direction, tool, and cycle time) serve as the basic units to replace the traditional method in which only parts are taken into consideration. Connectors can be defined as the basic units that offer limitations to components, and when these units are combined, they will perform the required functions. Under the constraints of connector-based precedence graph, similarity between connectors is used to arrange the assembly tasks. When the result meets the cycle-time requirements and the types of stations to which the connectors belong, the arrangement of stations based on the assembly sequential order is processed. Genetic algorithms are proposed to solve the arrangement of connectors and the selection of stations. Two examples illustrate how to apply the model in practical cases.
机译:在瞬息万变的时代,应该对产品的研发(R&D)做出快速响应,以满足客户的各种需求。装配顺序计划和装配线平衡的顺序考虑可以有助于缩小设计和制造之间的差距。所谓的组装顺序计划是指计划人员根据产品设计说明以及他们在组装产品的所有组件时的特定试探法来安排特定的组装顺序的任务。装配线平衡涉及如何有效地安排每个装配任务,从而在整个装配线中达到最高效率和最短空转时间。在这项研究中,配备了装配工程信息(组合,方向,工具和循环时间)的连接器是替代仅考虑零件的传统方法的基本单位。可以将连接器定义为对组件提供限制的基本单元,并且当这些单元组合在一起时,它们将执行所需的功能。在基于连接器的优先级图的约束下,连接器之间的相似性用于安排组装任务。当结果满足循环时间要求和连接器所属的工作站类型时,将根据装配顺序对工作站的排列进行处理。提出了遗传算法来解决连接器的布置和站点的选择。两个示例说明了如何在实际情况下应用该模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号