首页> 外文期刊>International Journal of Production Research >Hybrid two-stage planning for food industry overproduction waste minimization
【24h】

Hybrid two-stage planning for food industry overproduction waste minimization

机译:食品工业生产过剩废物最小化的混合两阶段计划

获取原文
获取原文并翻译 | 示例
       

摘要

Convenience food manufacture generates considerable waste due to the planning of production being undertaken based upon forecasted orders. This problem is particularly acute for products that have a very short shelf-life and are subject to considerable volatility in demand, such as ready-meals. Overproduction wastes (OPWs) typically result in finished products being disposed of through commercial waste channels, which is both costly for manufacturers and represents poor and unsustainable use of resources. This paper reports on a hybrid two-stage planning technique for the reduction of OPW by utilizing the advantages offered through both static and dynamic approaches to production scheduling. The application of this planning approach to a case study ready-meal manufacturer through the development of commercially available planning software is also described.
机译:由于根据预测的订单进行生产计划,因此方便食品制造会产生大量浪费。对于保质期非常短并且需求波动较大的产品(例如即食食品),此问题尤为严重。生产过剩的废物(OPW)通常会导致成品通过商业废物渠道进行处置,这不仅对制造商来说成本高昂,而且意味着对资源的不良和不可持续使用。本文报告了一种混合两阶段计划技术,该技术通过利用静态和动态方法进行生产调度而减少了OPW。还介绍了通过开发可商购的计划软件将这种计划方法应用于案例研究食品制造商的情况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号