首页> 外文期刊>International Journal of Production Research >Dependence of lead time on batch size studied by a system dynamics model
【24h】

Dependence of lead time on batch size studied by a system dynamics model

机译:系统动力学模型研究提前期对批次大小的依赖性

获取原文
获取原文并翻译 | 示例
           

摘要

Most planning models treat lead time as a constant independent of workload, but the resulting order rate implies capacity utilisation that, in turn, affects the lead time. An important factor that determines production order rate is the batch size, and one therefore expects a relationship between batch size and lead time. This dependency is examined for different operational conditions using system dynamics simulation of a manufacturing model comprising a quality control unit that is also the bottleneck of the system. It is shown that there is an optimal batch size that results in a minimum lead time and that inventory level at optimum matches the desired inventory. Below optimal batch size, lead time increases sharply due to congestion at the bottleneck. The results have implications for production planning and implementation of process improvement.
机译:大多数计划模型将提前期视为与工作量无关的常数,但是最终的订单率意味着产能利用率,进而影响提前期。决定生产订单率的一个重要因素是批次大小,因此,人们希望批次大小与交货时间之间存在关系。使用包括质量控制单元的制造模型的系统动力学仿真,检查了对于不同操作条件的这种依赖性,该质量模型也是系统的瓶颈。结果表明,存在一个最佳的批次大小,可导致最短的交货时间,并且最佳状态下的库存水平与所需库存相匹配。低于最佳批量时,由于瓶颈处的拥堵,交货时间急剧增加。结果对生产计划和过程改进的实施有影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号