...
首页> 外文期刊>International Journal of Production Research >Operations scheduling with multiple resources and transportation considerations
【24h】

Operations scheduling with multiple resources and transportation considerations

机译:具有多种资源和运输考虑因素的作业调度

获取原文
获取原文并翻译 | 示例
           

摘要

We study a scheduling problem with the operations that require renewable as well as non-renewable resources. After an operation has been completed, the non-renewable resource is depleted whereas the renewable resource can be made available for the next operation. Of both the renewable and the non-renewable resources limited amounts are available and they need to be transported to the locations where they are needed. The operations have deadlines, and the availability of the renewable resources depends on the sequence of the operations. Such operations scheduling problems are commonly encountered in the practices of emergency logistics that deliver medical services to the affected areas after a disaster, where renewable resources typically refer to medical teams and non-renewable resources refer to medical supplies. We present a complexity classification for our problem and show where the borderline lies between NP-hardncss and polynomial time solvability. We analyse the structural properties of our problem, provide strongly polynomial-time solutions for four special cases and list the cases that are computationally intractable. Finally, we propose a framework of heuristic procedures for solving more general versions of this problem.
机译:我们研究需要可再生资源和不可再生资源的调度问题。操作完成后,不可再生资源将被耗尽,而可再生资源可用于下一个操作。在可再生资源和不可再生资源中,可用数量有限,需要将它们运输到需要的地方。操作有最后期限,可再生资源的可用性取决于操作的顺序。在灾难发生后向受灾地区提供医疗服务的紧急后勤实践中通常会遇到此类操作计划问题,其中可再生资源通常指医疗队,不可再生资源指医疗物资。我们为问题提供了复杂度分类,并显示了NP-hardncss和多项式时间可解性之间的界线。我们分析问题的结构性质,为四个特殊情况提供强多项式时间解,并列出在计算上难以处理的情况。最后,我们提出了一个启发式程序框架,用于解决此问题的更一般版本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号