首页> 外文期刊>International Journal of Production Research >Project network-oriented materials management policy for complex projects: a Fuzzy Set Theoretic approach
【24h】

Project network-oriented materials management policy for complex projects: a Fuzzy Set Theoretic approach

机译:面向项目网络的复杂项目物料管理策略:模糊集理论方法

获取原文
获取原文并翻译 | 示例
       

摘要

This work devises a materials management policy integrated with project network characteristics of complex projects. It proposes a relative quantitative measure, overall criticality (OC), for prioritisation of items based on penalty incurred due to their non-availability. In complex projects, practicing managers find it difficult to measure OC of items because of the subjective factors and intractable nature of penalties involved. However, using their experience, they can linguistically identify the antecedents and relate them to consequent OC. This work adopts Fuzzy Set Theory to capture managerial tacit knowledge which provides them enough flexibility to provide information in real form. Computed OC values can be used for items prioritisation and as shortage cost coefficient in inventory models. The revised materials management policy was applied to a shipbuilding project. OC values were analysed to justify the importance of incorporating project network characteristics and potential cost savings were calculated.
机译:这项工作设计了一种与复杂项目的项目网络特征相集成的物料管理策略。它提出了一种相对定量的方法,即总体关键性(OC),用于根据因物品不可用而产生的罚款来对物品进行优先级排序。在复杂的项目中,由于主观因素和所涉及处罚的难解性质,执业经理发现很难衡量项目的超额付款。但是,利用他们的经验,他们可以从语言上识别先例并将其与后续的OC相关联。这项工作采用模糊集理论来捕获管理人员的隐性知识,这为他们提供了足够的灵活性以提供真实形式的信息。计算出的OC值可用于项目优先级排序,并可用作库存模型中的短缺成本系数。经修订的材料管理政策已应用于造船项目。分析了OC值以证明纳入项目网络特征的重要性,并计算了潜在的成本节省。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号