首页> 外文期刊>International Journal of Production Research >A combined supply chain optimisation model for the installation phase of offshore wind projects
【24h】

A combined supply chain optimisation model for the installation phase of offshore wind projects

机译:海上风电项目安装阶段的组合供应链优化模型

获取原文
获取原文并翻译 | 示例
       

摘要

This paper proposes a combined model for port selection and supply chain optimisation for the installation phase of an offshore wind farm. Two strategic models are proposed where the first model, based on Analytical Hierarchy Process (AHP), aims to select the most suitable installation port. The second model is developed using Integer Linear Programming (ILP) in order to determine the optimal transportation schedule of the components from suppliers to the chosen installation port. The proposed models are evaluated for the West Gabbard (UK) offshore wind farm located in southern part of the North Sea. According to the computational results, the AHP model chooses port of Oostende, Belgium as the most suitable installation port for this offshore wind farm whereas the proposed supply chain model shows that the total transportation cost makes up 9% of total supply chain cost.
机译:本文为海上风电场的安装阶段提出了港口选择和供应链优化的组合模型。提出了两个战略模型,其中第一个模型基于分析层次过程(AHP),旨在选择最合适的安装端口。第二个模型是使用整数线性规划(ILP)开发的,以确定组件从供应商到所选安装端口的最佳运输时间表。对位于北海南部的西加巴德(英国)海上风电场进行了评估。根据计算结果,AHP模型选择比利时的Oostende港口作为该海上风电场的最合适的安装港口,而提议的供应链模型显示总运输成本占总供应链成本的9%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号