Dynamic order acceptance and capacity planning in a stochastic multi-project environment with a bottleneck resource

机译:具有瓶颈资源的随机多项目环境中的动态订单接受和容量计划

获取原文
获取原文并翻译 | 示例
       

摘要

We study the integration of order acceptance and capacity planning in multi-project environments with dynamically arriving projects. We model this planning problem as a continuous-time Markov decision process to determine long-term optimal decisions. We examine whether macro-process planning should be performed before or after order acceptance. We characterise the structure of optimal policies, and explore the dependence on a number of parameters such as project payoff, project cost and order arrival time. We also look into the effects of set-up costs and the use of non-regular capacity.
机译:我们研究具有动态到达项目的多项目环境中订单接受和能力计划的集成。我们将此规划问题建模为连续时间的马尔可夫决策过程,以确定长期最优决策。我们检查是否应在订单接受之前或之后执行宏观流程计划。我们描述最佳政策的结构,并探索对许多参数的依赖,例如项目收益,项目成本和订单到达时间。我们还将研究设置成本和使用非常规容量的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号