Resource Allocation and Planning in Single and Multi-Project Environments

机译:单个和多个项目环境中的资源分配和计划

获取原文
获取原文并翻译 | 示例
       

摘要

IT projects often fail to be completed on time, on budget, within scope, with the required functionality and error free. The reasons for project failure are numerous and have been well studied and identified in the literature; however, most studies assume that project managers are completely devoted to the execution of the project and disregard any time wasting efforts that keep them from these duties. One such duty is the assignment and tracking of personnel to tasks within a project. As workers become over-allocated, the PM must redirect his or her efforts to balancing the overall schedule. This task is often performed manually causing PMs to spend much of their time attending to the details of the schedule instead of dealing with the issues critical to the project. The author describes here software that optimizes the schedule when resources are limited and describe its use in both single and multiple project environments.
机译:IT项目通常无法按时,按预算,在范围内完成具有所需功能且没有错误的项目。项目失败的原因很多,并且已经在文献中进行了充分的研究和确定。但是,大多数研究都假定项目经理完全专注于项目的执行,而无视任何浪费时间的工作,使他们无法履行这些职责。其中一项职责是对项目中的任务进行人员分配和跟踪。随着工作人员的过度分配,项目经理必须将他或她的工作重新分配到平衡总体计划上。该任务通常是手动执行的,导致PM将大部分时间都花在计划表的细节上,而不是处理对项目至关重要的问题。作者在此处介绍了可在资源有限时优化进度的软件,并介绍了其在单个和多个项目环境中的使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号