首页> 外文期刊>International Journal of Production Economics >Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system
【24h】

Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system

机译:在可恢复的制造系统中使用优先级调度规则和滚筒缓冲绳进行调度

获取原文
获取原文并翻译 | 示例
           

摘要

The development of environmentally conscious manufacturing systems has become of increasing concern. A recoverable manufacturing system is such a system and seeks to minimize waste through a variety of strategies, including remanufacturing. However, despite the growth in this type of systems, there are few established scheduling systems reported in the literature. Drum-buffer-rope has been shown to be successful in planning, scheduling and controlling remanufacturing operations, but to date there have been no formal examinations of what priority dispatching rules should be used at non-constraint work centers to best support drum-buffer-rope. This study examines a number of priority dispatching rules in combination with drum-buffer-rope under a variety of utilization levels, via a simulation model of an actual remanufacturing facility. The findings indicate that simple priority dispatching rules, such as first-in, first-out rule or earliest due-date, work best to support drum-buffer-rope, but that other factors must be considered when using drum-buffer-rope for scheduling in a remanufacturing environment with changing demand rates.
机译:具有环境意识的制造系统的发展已变得越来越受到关注。可回收的制造系统就是这样一种系统,它试图通过包括再制造在内的各种策略来减少浪费。然而,尽管这种类型的系统在增长,但是文献中报道的建立的调度系统却很少。鼓式缓冲绳已被证明在计划,调度和控制再制造操作方面是成功的,但迄今为止,尚未正式检查应在非约束性工作中心使用哪种优先级分配规则以最好地支持鼓式缓冲绳。绳。这项研究通过实际再制造设施的仿真模型,研究了在各种利用率水平下与鼓式缓冲绳结合使用的许多优先级分配规则。研究结果表明,简单的优先级分配规则(例如先进先出规则或最早的到期日期)最能支持鼓缓冲绳,但在将鼓缓冲绳用于以下操作时必须考虑其他因素在需求率不断变化的再制造环境中进行调度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号