首页> 外文期刊>International journal of production economics >Single machine parallel batch scheduling problem with release dates and three hierarchical criteria to minimize makespan, machine occupation time and stocking cost
【24h】

Single machine parallel batch scheduling problem with release dates and three hierarchical criteria to minimize makespan, machine occupation time and stocking cost

机译:具有发布日期和三个层次标准的单机并行批处理调度问题,以最大程度地减少工期,机器占用时间和库存成本

获取原文
获取原文并翻译 | 示例
       

摘要

In this paper we consider an unbounded model of the single machine parallel batch scheduling problem with release dates and three hierarchical criteria. The first criterion is to minimize makespan, the second criterion is to minimize machine occupation time and the third criterion is to minimize stocking cost. We solve this problem by an O(n~2) time dynamic programming algorithm.
机译:在本文中,我们考虑具有发布日期和三个层次标准的单机并行批处理调度问题的无边界模型。第一个标准是最小化制造时间,第二个标准是最小化机器占用时间,第三个标准是最小化库存成本。我们通过O(n〜2)时间动态规划算法解决了这个问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号