首页> 美国卫生研究院文献>other >Single-Machine Scheduling to Minimize Total Completion Time and Tardiness with Two Competing Agents
【2h】

Single-Machine Scheduling to Minimize Total Completion Time and Tardiness with Two Competing Agents

机译:具有两个竞争代理的单机调度可最大程度地减少总完成时间和拖延时间

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

We consider a single-machine two-agent problem where the objective is to minimize a weighted combination of the total completion time and the total tardiness of jobs from the first agent given that no tardy jobs are allowed for the second agent. A branch-and-bound algorithm is developed to derive the optimal sequence and two simulated annealing heuristic algorithms are proposed to search for the near-optimal solutions. Computational experiments are also conducted to evaluate the proposed branch-and-bound and simulated annealing algorithms.
机译:我们考虑一个单机双代理问题,其目的是在不考虑第二代理的拖延工作的情况下,将总完成时间和来自第一代理的工作的总延误的加权组合最小化。提出了一种分支定界算法来推导最优序列,并提出了两种模拟退火启发式算法来寻找近似最优解。还进行了计算实验,以评估提出的分支定界和模拟退火算法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号