首页> 外文期刊>International journal of production economics >Capacitated planning and scheduling for combined make-to-order and make-to-stock production in the food industry: An illustrative case study
【24h】

Capacitated planning and scheduling for combined make-to-order and make-to-stock production in the food industry: An illustrative case study

机译:食品行业按订单生产和按库存生产组合的功能强大的计划和调度:一个示例性案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

More and more production systems are now-a-days following a combined make-to-order (MTO) and make-to-stock (MTS) production mode. This paper tests the conceptual production planning and inventory control framework, developed recently, for such combined situations. We apply the framework in the case of a firm that produces 230 products on a single line with limited capacity. Areas of improvements in the framework have been identified and possible analytical decision aids are suggested. In particular, the short-term batch-scheduling problem requires more attention and we provide a heuristic to solve that problem.
机译:结合按订单生产(MTO)和按库存生产(MTS)的生产模式,如今的生产系统越来越多。本文针对这种组合情况测试了最近开发的概念性生产计划和库存控制框架。如果一家公司只能在一条生产线中以有限的产能生产230种产品,那么我们将采用该框架。已经确定了框架中需要改进的领域,并提出了可能的分析决策帮助。特别是,短期批量计划问题需要更多关注,我们提供了启发式方法来解决该问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号