...
首页> 外文期刊>International journal of production economics >An integrated vendor-buyer inventory model with quality improvement and lead time reduction
【24h】

An integrated vendor-buyer inventory model with quality improvement and lead time reduction

机译:集成的卖方-买方库存模型,可改善质量并缩短交货时间

获取原文
获取原文并翻译 | 示例
           

摘要

The success of the Japanese in the employment of just-in-time (JIT) production has received a great deal of attention in the past two decades. The underlying goal of JIT is to eliminate wastes, which can be achieved through various efforts such as shortening lead time and improving quality. Recently, Yang and Pan [2004. Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment. International Journal of Production Research 42(5), 853-863] have studied the effects of lead time reduction and quality improvement investment on an integrated inventory model. The objective of this study is to extend Yang and Pan's (2004) model by allowing for shortages and using the reorder point as a decision variable. That is, this article develops an integrated inventory model which jointly determines the optimal order quantity, reorder point, process quality, lead time and the frequency of deliveries simultaneously. Analytical results that characterize the exact, optimal policy for the problem described above are devised to develop efficient and optimal computational procedures. Furthermore, a numerical example is given to illustrate the results.
机译:在过去的二十年中,日本人在使用即时(JIT)生产方面的成功受到了广泛关注。 JIT的根本目标是消除浪费,这可以通过各种工作来实现,例如缩短交货时间和提高质量。最近,Yang and Pan [2004。即时采购:一种集成的库存模型,涉及确定性可变提前期和质量改进投资。国际生产研究杂志42(5),853-863]研究了提前期减少和质量改进投资对集成库存模型的影响。这项研究的目的是通过允许短缺和使用重新排序点作为决策变量来扩展Yang和Pan(2004)的模型。也就是说,本文开发了一个集成的库存模型,该模型可以共同确定最佳订单数量,再订购点,过程质量,提前期和交货频率。旨在描述上述问题的精确,最优策略的分析结果被设计用于开发高效,最优的计算程序。此外,给出了一个数值示例来说明结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号