首页> 外文期刊>International journal of production economics >Production logistics and ergonomic evaluation of U-shaped assembly systems
【24h】

Production logistics and ergonomic evaluation of U-shaped assembly systems

机译:U型装配系统的生产物流和人体工程学评估

获取原文
获取原文并翻译 | 示例
       

摘要

In the context of production logistics, U-shaped assembly systems often present several advantages compared to straight-line systems. Therefore, such systems are usually evaluated in the planning phase using production logistics and cost-related criteria. However, some published papers illustrate that these advantages may face ergonomic drawbacks. For decision making, the evaluation must be expanded in order to consider these systems from both perspectives. In this way, unfavorable forms of work organization in U-shaped assembly systems can be detected already during the planning phase. In addition, the static methods such as spreadsheet calculations generally used for planning prove to be poorly applicable due to the overly optimistic results they generate, especially in case of model-mix systems. These aspects are especially addressed here and the difference between static and dynamic approaches are illustrated. Consequently, planning solutions must be validated dynamically by means of simulation. Only then can be judged whether the planned production logistics criteria are achievable at all. In addition, the simulation allows for more realistic statements also concerning ergonomic criteria. This approach will be demonstrated here by a near-to-reality planning case. For a comprehensive multi-criteria decision making in the face of production logistics and ergonomics the use of lexicographic ordering is shown.
机译:在生产物流的背景下,与直线系统相比,U形装配系统通常具有多个优势。因此,通常在计划阶段使用生产后勤和成本相关标准来评估此类系统。但是,一些已发表的论文表明这些优点可能会面临人体工程学的缺点。对于决策,必须扩大评估范围,以便从两个角度考虑这些系统。这样,在计划阶段就可以检测到U形装配系统中不利的工作组织形式。另外,通常用于计划的静态方法(例如电子表格计算)由于其生成的过于乐观的结果而被证明不适用,尤其是在模型混合系统的情况下。这些方面在此特别解决,并说明了静态方法与动态方法之间的差异。因此,必须通过仿真来动态验证计划解决方案。只有这样才能判断计划的生产物流标准是否完全可以实现。此外,模拟还可以针对人体工程学标准做出更现实的陈述。这里将通过一个接近实际的计划案例来演示这种方法。对于面对生产物流和人机工程学的综合多准则决策,需要使用字典顺序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号