首页> 外文期刊>The International Journal of Life Cycle Assessment >Integration of life cycle assessment into planning and project delivery for pavements in the USA
【24h】

Integration of life cycle assessment into planning and project delivery for pavements in the USA

机译:将生命周期评估整合到美国人行道规划和项目交付中

获取原文
获取原文并翻译 | 示例
           

摘要

Purpose Environmental impacts are typically considered in transportation decisions through planning and environmental review processes. Recent state-level legislation in the USA institutes requirements to track environmental performance of construction materials in bidding on public projects. To support this new initiative, this study aims to identify specific life cycle assessment (LCA) frameworks that can effectively impact the decisions on every level in the planning and project delivery process and evaluate the implementation readiness level. Methods The objective of this study was pursued through literature review and discussions facilitated at a workshop with representatives of six State Departments of Transportation (DOTs). Through the dialog with stakeholders, the details of the current planning and project delivery process were identified. After the participants were provided with background on LCA, LCA methodology, the most suitable to impact decisions at every decision-making level, was investigated considering key decisions (Why?), type of the analysis (How?), available data (What?), and the involved decision-makers (Who?) pertinent to each phase. The potential to develop tools to inform the decisions, the readiness level, and obstacles to LCA implementation was evaluated subsequently by authors and informed by a literature review. Results and discussion A consequential LCA was identified as the effective method to inform long-range planning. Attributional LCAs for a network and project level were regarded as suitable in programming and project development, respectively. Environmental product declatations (EPDs) were found applicable in bidding, while the construction phase was found best suited for data collection that can feed back into the upstream decision-making phases. The lack of a feedback loop between the quantified environmental impacts and the decision-making was identified as a major obstacle by stakeholders. A lack of clarity on progress toward environmental goals was specified as another hindrance. The development of tools and systems for communication and data transfer among the key stakeholders is expected to facilitate LCA use, close a feedback loop, and provide for progress tracking. Conclusions The relatively high readiness level of LCA implementation was identified in the pavement design phase (parallel to life cycle cost analysis (LCCA)) and in the construction phase (as-built environmental impact tracking and data collection). Initiating data collection in these two phases can provide an impetus for improving environmental performance and meaningfully inform other decision-making phases. Additionally, the importance of education and cross-collaboration is recognized by all stakeholders.
机译:目的通过规划和环境审查流程通常考虑环境影响。近期国家级立法在美国院校要求跟踪公共项目招标环境绩效。为支持这一新举措,本研究旨在识别能够有效影响规划和项目交付过程中各个级别的决策的具体生命周期评估(LCA)框架,并评估实施准备水平。方法采用文学审查和讨论在六国交通部门(DOTS)代表的研讨会上促进了本研究的目的。通过与利益相关者的对话,确定了当前规划和项目交付过程的细节。在LCA,LCA方法的背景下提供参与者之后,考虑到关键决策(为什么?),分析(如何?),可用数据(如何?),可用数据(如何?),可用数据(如何?),可用数据(如何?) ),与每个阶段相关的涉及的决策者(WHO?)。作者随后,随后通过作者进行评估,向LCA实施的决策,准备水平和障碍物提供信息,并通过文献综述来了解。结果和讨论将相应的LCA确定为通知远程规划的有效方法。网络和项目级别的归因LCAS分别被视为适用于编程和项目开发。发现环境产品拒绝(EPD)适用于竞标,而施工阶段则最适合能够回到上游决策阶段的数据收集。缺乏量化的环境影响与决策之间的反馈回路被确定为利益攸关方的主要障碍。对环境目标的进展缺乏明确指定为另一个障碍。预计关键利益相关者之间的通信和数据传输的工具和系统的开发将有助于LCA使用,关闭反馈循环,并提供进度跟踪。结论在路面设计阶段(平行于生命周期成本分析(LCCA))和施工阶段(竣工环境影响跟踪和数据收集)中鉴定了LCA实现的相对高度准备水平。在这两个阶段启动数据收集可以提供改善环境绩效并有意义地通知其他决策阶段的推动力。此外,所有利益攸关方都承认了教育和交叉合作的重要性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号