...
首页> 外文期刊>International Journal of Information Systems and Supply Chain Management >Research on Distribution of Hobbing Machine Spare Parts with Time Limits
【24h】

Research on Distribution of Hobbing Machine Spare Parts with Time Limits

机译:时限滚齿机备件分布研究

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Distribution of hobbing machine spare parts is a key factor to improve the efficiency of service-oriented spare part allocation. In order to minimize the distribution route, the distribution model of hobbing machine spare parts with time limits was put forward. The modified savings algorithm was adopted to solve the model. To improve the loading rate of classic savings algorithm, the modified savings algorithm allowed the split delivery according to customers' requirements. A case study verified that the application of modified savings algorithm ensured the shortest distribution route and improved the vehicle loading rate.
机译:滚齿机备件的分配是提高面向服务备件分配效率的关键因素。为了使配送路线最小化,提出了带时限的滚齿机备件配送模型。采用改进的储蓄算法对该模型进行求解。为了提高经典储蓄算法的加载速度,改进后的储蓄算法允许根据客户的要求进行分批交付。实例研究表明,改进的节约算法的应用确保了最短的配送路线,提高了车辆的装载率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号