首页> 外文期刊>International Journal of Information and Management Sciences >The Relation Between Cost and Yield Rate in a JIT Production System
【24h】

The Relation Between Cost and Yield Rate in a JIT Production System

机译:JIT生产系统中成本与收益率之间的关系

获取原文
获取原文并翻译 | 示例
       

摘要

In this paper we consider production economic and cost related yield rate in a JIT (Just in Time) system. Based on the traditional EPQ (Economic Production Quantity) model, we establish the relation between cost and yield rate. The geometric programming approach is applied in our model to solve this optimizing posynomials problem. A numerical example is carried out to verify the proposed model. Through this paper, we connect the cost and yield rate in a JIT production system. This study demonstrates the power and efficiency of the geometric programming approach for the particular type of EPQ problem.
机译:在本文中,我们考虑了JIT(及时生产)系统中与生产经济性和成本相关的生产率。在传统的EPQ(经济生产数量)模型的基础上,我们建立了成本与收益率之间的关系。在我们的模型中采用了几何规划方法来解决这个优化的正多项式问题。数值例子验证了所提出的模型。通过本文,我们将JIT生产系统中的成本和收益率联系起来。这项研究证明了针对特定类型的EPQ问题的几何编程方法的强大功能和效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号