首页> 外文期刊>International journal of industrial and systems engineering >Finite capacity material requirement planning with supplier constraints
【24h】

Finite capacity material requirement planning with supplier constraints

机译:受供应商限制的有限能力物料需求计划

获取原文
获取原文并翻译 | 示例
       

摘要

This paper develops a practical finite capacity material requirement planning (FCMRP) system that considers finite capacity of work centres and constraints of suppliers. First, a variable lead-time MRP system is used to transform the customer orders to planned work and purchase orders. The purchase orders are evaluated and revised by the suppliers based on their constraints. Second, the system schedules manufacturing operations on key work centres of not only the factory but also suppliers. Third, a linear programming model is used to determine the optimal start time of each manufacturing operation to minimise the overall performance index, considering finite capacity of all work centres, precedence constraints of operations, and supplier constraints. The proposed FCMRP system is tested using an experimental case. The results indicate that all scheduling mechanisms have significant effect on the overall performance index and the FCMRP system with supplier constraints can generate more realistic schedule than the system without supplier constraints.
机译:本文开发了一种实用的有限能力物料需求计划(FCMRP)系统,该系统考虑了工作中心的有限能力和供应商的约束。首先,使用可变提前期MRP系统将客户订单转换为计划工作和采购订单。供应商根据其约束条件对采购订单进行评估和修订。其次,该系统不仅在工厂而且在供应商的关键工作中心上计划制造操作。第三,考虑所有工作中心的有限能力,操作的优先约束和供应商的约束,使用线性规划模型来确定每个制造操作的最佳开始时间,以使总体性能指标最小化。所提出的FCMRP系统是通过实验案例进行测试的。结果表明,所有调度机制均会对整体绩效指标产生重大影响,具有供应商约束的FCMRP系统比没有供应商约束的系统能够生成更实际的调度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号