...
首页> 外文期刊>International journal of industrial and systems engineering >Optimal replacement period with cumulative repair cost limit under a cumulative damage model
【24h】

Optimal replacement period with cumulative repair cost limit under a cumulative damage model

机译:累积损坏模型下具有累积维修费用限额的最优更换期

获取原文
获取原文并翻译 | 示例

摘要

In this paper, a periodic replacement policy for a system under a cumulative shock damage process is presented; this policy includes the concept of a cumulative repair cost limit. When an external shock occurs, this shock can be divided into two types. Each type-1 shock causes some damage to the system; these damages are additive, and the system goes into serious failure when the total damage has exceeded a failure level K. A type-2 shock causes the system to experience a minor failure that can be corrected by minimal repair. When a minor failure occurs, the repair cost will be evaluated, and the minimal repair is executed if the accumulated repair cost is less than a predetermined limit L. The system is replaced anticipatively at scheduled time T, or at the j~(th) minor failure (j < n) at which the accumulated repair cost exceeds a predetermined limit L, or any serious failure. The long-term expected cost per unit time is formulated by introducing relative costs. By minimising that cost, the optimal period T~* is also verified finite and unique under certain conditions.
机译:本文提出了在累积冲击破坏过程中系统的定期更换策略。该政策包括累积维修费用限额的概念。当发生外部电击时,该电击可分为两种类型。每次1类电击都会对系统造成一定程度的损坏。这些损坏是累加的,当总损坏超过故障等级K时,系统将进入严重故障状态。2型电击会导致系统经历较小的故障,可以通过最少的维修来纠正。当发生轻微故障时,将评估维修成本,如果累计维修成本小于预定极限L,则将执行最小维修。系统将在计划的时间T或第j个(第)个被替换累计维修费用超过预定极限L的轻微故障(j

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号