Nam Leuk hydro project overcomes challenges

机译:尼斯水电项目克服了挑战

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Nam Leuk hydro project is an essential component of the strategy adopted by the Government of the Lao PDR for the power sub-sector, to achieve the Government's social and economic objectives. There were initial construction delays at the site, but following action plans initiated by one financier and acceleration measures put together by the Owner and the Engineer, the project was put back on track, and has now been in operation for a year and a half, meeting its production targets. This article gives an overview of the scheme and its implementation, focusing particularly on the measures taken to ensure timely implementation of the scheme, project costs, economic aspects, and environmental and social benefits.
机译:Nam Leuk水电项目是老挝政府为电力子行业采取的战略的重要组成部分,以实现政府的社会和经济目标。该站点最初的施工延期,但是在由一名融资人发起的行动计划以及业主和工程师共同制定的加速措施之后,该项目已恢复正常运行,并且已经运行了一年半,达到其生产目标。本文概述了该计划及其实施,尤其着重于为确保及时实施该计划而采取的措施,项目成本,经济方面以及环境和社会效益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号