首页> 外文期刊>International Journal on Hydropower & Dams >Atel and SSB approve Nant de Drance
【24h】

Atel and SSB approve Nant de Drance

机译:Atel和SSB批准Nant de Drance

获取原文
获取原文并翻译 | 示例
           

摘要

Power producer Atel of Switzerland and the country's federal railway operator SSB are to proceed with the joint construction of the 600 MW Nant de Drance pumped-storage sta- tion at Finhaut in the Swiss Alps. The Board of Directors of Atel and SBB voted in late April to build the CHF 990 million (US$ 950 million) project. Atel will hold 60 per cent of the project, while SBB will own 40 per cent. Atel said that approval was subject to the developers securing a licence and building permit and additional cost limits being set for construction and operation. Construction is scheduled to begin in mid-2008, with the plant expected to begin commercial service in 2015.
机译:瑞士的电力生产商Atel和该国的联邦铁路运营商SSB将在瑞士阿尔卑斯山Finhaut进行600 MW Nant de Drance抽水蓄能电站的联合建设。 Atel和SBB的董事会于4月下旬投票决定建设9.9亿瑞士法郎(9.5亿美元)的项目。 Atel将持有该项目60%的股份,而SBB将拥有40%的股份。 Atel说,批准要取决于开发商是否获得许可和建筑许可,以及为建筑和运营设定额外的成本限制。该工厂计划于2008年年中开始建设,预计将于2015年开始商业服务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号