...
首页> 外文期刊>Power in Europe >Alpiq sees power price recovery, Nant de Drance set for Dec. 2021 start
【24h】

Alpiq sees power price recovery, Nant de Drance set for Dec. 2021 start

机译:Alpiq看到电力价格回收,12月2021年12月的Nant De Drance Set

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Swiss utility Alpiq expects power prices to recover further as its $2 billion Nant de Drance pumped storage plant enters operation by the end of 2021, it said Aug. 24. The 900 MW power plant is being gradually commissioned after the first of six 150 MW turbines was connected to the grid this summer. In its half-year results, the utility booked a CHF66 million ($71 million) impairment for legacy contracts at the pump storage plant because of less volatility in the hourly price profile, lower short-term market prices and another three-month delay to December 2021 for the project, which started construction in 2008.
机译:瑞士公用事业Alpiq预计电力价格将进一步恢复,因为其20亿美元的Nant De Drance泵送储存工厂在2021年底进入运营24.在六个150 MW涡轮机中的第一款之后,900 MW电厂正在逐步委托。今年夏天连接到网格。在其半年的结果中,该型公用事业公司在泵储存工厂的遗产合约中预订了百分之一的遗产(7100万美元)损伤,因为在每小时价格简介,较低的短期市场价格和另外三个月延迟到12月2021年项目于2008年开始施工。

著录项

  • 来源
    《Power in Europe》 |2020年第830期|22-22|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号