...
首页> 外文期刊>International Journal on Hydropower & Dams >Conveyor systems to facilitate RCC placement
【24h】

Conveyor systems to facilitate RCC placement

机译:输送系统,方便放置RCC

获取原文
获取原文并翻译 | 示例

摘要

As RCC becomes increasingly popular worldwide for the construction of large dams, including some of the major projects in Africa and Asia, materials handling equipment assumes particular importance, to ease the placement process. Equipment supplied recently for the Neckartal dam in Namibia, and the Susu dam for the Ulu Jelai hydro scheme in Malaysia, illustrates some of the recent developments. STM of Italy specializes in the engineering and supply of belt conveyor systems for bulk materials handling facilities. In the field of RCC dams, STM has developed equipment for the whole material handling process, for conveying the aggregates to the cooling and batching plant, and also for transporting the RCC from the batching plant to the dam site.
机译:随着RCC在全球范围内的大型水坝建设(包括非洲和亚洲的一些重大项目)中越来越受欢迎,物料搬运设备变得尤为重要,以简化安放过程。最近为纳米比亚的内卡塔尔大坝供应的设备以及为马来西亚的乌鲁吉来水电计划提供的苏苏大坝提供的设备说明了最近的一些发展。意大利STM专业从事散装物料处理设施的皮带输送机系统的工程设计和供应。在RCC大坝领域,STM开发了用于整个物料处理过程的设备,用于将骨料输送到冷却和配料厂,以及将RCC从配料厂运输到坝址。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号