...
首页> 外文期刊>International Journal of Electrical Power & Energy Systems >Two layer hydropower plant dynamic mathematical modelling using synchronized measurements
【24h】

Two layer hydropower plant dynamic mathematical modelling using synchronized measurements

机译:使用同步测量的两层水电厂动态数学建模

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The operation and control of electric power system highly depends on knowledge of dynamic conditions. Power plants, especially hydropower plants, have the highest impact on overall power system dynamics. Therefore, dynamic mathematical model of hydropower plant was developed in order to conduct a theoretical research of the dynamic conditions of the transmission power system during normal and abnormal operating conditions. To build the mathematical model of the hydropower plant, synchronized phasor measurements from the Phasor Measurement Units were used for a dynamic picture of a part of power system near hydropower plant. Relevant events recorded by WAM (Wide Area Monitoring) System were used for fine tune-up of the dynamic mathematical model of hydropower plant. Additional validation of the mathematical model was made by using MatLab calculations. An example of the proposed dynamic modelling was performed on reversible hydropower plant.
机译:电力系统的运行和控制高度依赖于动态条件的知识。发电厂,特别是水力发电厂,对整个电力系统的动态影响最大。因此,开发了水力发电厂的动态数学模型,以便对输电系统在正常和异常工况下的动态状况进行理论研究。为了建立水力发电厂的数学模型,将相量测量单元的同步相量测量用于水力发电厂附近电力系统一部分的动态图像。使用WAM(广域监视)系统记录的相关事件来微调水电厂的动态数学模型。通过使用MatLab计算对数学模型进行了额外的验证。在可逆水力发电厂上进行了所提出的动态建模的示例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号