首页> 外文期刊>International journal of decision sciences, risk and management >Risk management in a major highway construction joint venture project
【24h】

Risk management in a major highway construction joint venture project

机译:大型公路建设合资项目的风险管理

获取原文
获取原文并翻译 | 示例
           

摘要

This paper deals with risk management in a major highway construction project in progress, that of the design, construction, operation, maintenance and exploitation of the Elefsina-Korinthos-Patra-Pyrgos-Tsakona ('Olympia Odos') motorway in Greece, a collaboration between the Greek State and a private concessionaire. The contract between those stakeholders is analysed in order to identify possible foreseen and unforeseen risks to the project. Then, with the help of an expert panel, those risks are assessed and categorised in probability-versus-impact matrices. Also, as the project is currently stalled due to several reasons, another objective of the paper is to pinpoint the risks responsible for that problem, which require particular attention in order for the project to resume. Finally, this paper detects possible bias in the various points of the contract in favour of the Greek State or the concessionaire.
机译:本文涉及正在进行中的一项重大公路建设项目的风险管理,这是希腊的Elefsina-Korinthos-Patra-Pyrgos-Tsakona(“ Olympia Odos”)高速公路的设计,建设,运营,维护和开发的一项风险管理在希腊国家和私人特许经营商之间。分析这些利益相关者之间的合同,以便确定项目可能存在的可预见和不可预见的风险。然后,在专家小组的帮助下,将这些风险评估并归类为概率与影响矩阵。另外,由于该项目当前由于多种原因而停顿,因此本文的另一个目标是查明造成该问题的风险,需要特别注意才能恢复该项目。最后,本文发现了合同各方面可能对希腊国家或特许公司有利的偏见。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号