Daily planning and scheduling system for the EDS process in a semiconductor manufacturing facility

机译:半导体制造工厂中EDS工艺的每日计划和调度系统

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Operations management in a complex manufacturing environment is practiced hierarchically: production planning and scheduling in sequence since the integrated approach is not efficient and practical. Production targets and allocation to the equipment are determined in the planning procedure by considering the only the critical factors, and the detailed scheduling is determined with more information needed to accomplish the production targets provided in the planning step. There is always, therefore, a gap between the planning and scheduling procedure, and some control parameters or factors are used to control those gaps. In this paper an approach connecting two procedures is suggested, which can be applied in the EDS (electrical die sorting) or the probe process in the semiconductor manufacturing. The EDS process requires very flexible operation management since the manufacturing processing time is relatively short and the supply of upstream fabrication and the demand of downstream assembly have to be met simultaneously. Daily planning and scheduling procedure are modeled to minimize the tester change-over within the daily target. Because of the relatively long setup change-over time, daily planning and scheduling have to be performed so that the time needed for the device and probe card change is minimized as possible. Mathematical programming is suggested for the problem, and the modified model is developed which can be solved in a practical computational time on a daily base. The scheduling heuristic with the planning data obtained from the suggested model, is designed, and their performance is evaluated through the computational experiment.
机译:在复杂的制造环境中,操作管理是按层次进行的:由于集成方法效率高且不实用,因此按顺序进行生产计划和调度。在计划过程中,仅考虑关键因素即可确定生产目标和对设备的分配,并通过完成计划步骤中提供的生产目标所需的更多信息来确定详细的计划。因此,在计划和调度过程之间始终存在间隙,并且使用一些控制参数或因素来控制这些间隙。在本文中,提出了一种连接两个过程的方法,该方法可以应用于EDS(电子管芯分类)或半导体制造中的探测过程。 EDS过程需要非常灵活的操作管理,因为制造过程时间相对较短,并且上游制造的供应和下游组装的需求必须同时满足。对每日计划和调度程序进行建模,以最大程度地减少测试人员在每日目标范围内的转换。由于设置转换时间相对较长,因此必须执行每日计划和调度,以便尽可能减少设备和探针卡更换所需的时间。建议对该问题进行数学编程,然后开发改进的模型,该模型可以在日常的实际计算时间内解决。设计了从建议模型获得的计划数据启发式调度,并通过计算实验评估了它们的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号