首页> 外文期刊>International Gas Report >Uzbek GTL plant to cut oil, flaring
【24h】

Uzbek GTL plant to cut oil, flaring

机译:乌兹别克斯坦GTL工厂削减油,扩口

获取原文
获取原文并翻译 | 示例
           

摘要

Uzbekistan's planned gas-to-liquids plant at Shurtan will reduce its dependence on oil and should also help it to reduce gas flaring, Uzbek and foreign specialists said May 14 in Tashkent. The 1.37 million mt/year plant is planned to be operational in 2014, with a subsequent naphtha cracking plant coming on line between 2015 and 2017, a senior official of the Shurtan Gas Chemical Complex told Platts.rnSGCC Director Alisher Sultanov said a substitute source for 100,000 mt/year of oil had to be found. "We are interested in searching for alternative sources for fossil fuels," he said, adding that "GTL technology is becoming very relevant."
机译:乌兹别克斯坦和外国专家于5月14日在塔什干说,乌兹别克斯坦计划在舒尔坦建立的天然气制油厂将减少对石油的依赖,也将有助于减少天然气的燃烧。 Shurtan Gas Chemical Complex的一位高级官员告诉普氏能源资讯,这座年产137万吨/年的装置计划于2014年投入运营,随后的石脑油裂解装置将在2015年至2017年之间投产。SGCC主任Alisher Sultanov表示,必须找到每年100,000吨的石油。他说:“我们有兴趣寻找化石燃料的替代来源。”他补充说,“ GTL技术正变得越来越重要。”

著录项

  • 来源
    《International Gas Report》 |2009年第624期|17-17|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号