首页> 外文期刊>International Dredging Review >Contractors Use Trimble Software to Aid Bridge Demo and Removal
【24h】

Contractors Use Trimble Software to Aid Bridge Demo and Removal

机译:承包商使用Trimble Software来帮助桥梁演示和删除

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Tappan Zee Constructors, LLC, a consortium between Fluor Enterprises Inc., American Bridge Company, Granite Construction Northeast Inc., and Traylor Bros. Inc. was hired to design and build the new Governor Mario M. Cuomo Bridge, which is one of the largest single design-build contracts for a bridge project in the United States. The project was started in January of 2013 and, after a phased opening that started in 2017, the final south traveling lanes were opened in September of 2018. Deconstruc-tion work on the old bridge continues.
机译:Tappan Zee Constructors,LLC,Fluor Enterprises Inc.,American Bridge Company,Granite Construction Northeast Inc.和Traylor Bros Inc.的联盟。被聘请设计并建造新的州长Mario M. Cuomo Bridge,这是其中之一 最大的单一设计 - 在美国桥梁项目的合同。 该项目于2013年1月开始,并在2017年开始的逐步开放之后,最终南旅行车道于2018年9月开业。旧桥梁的Deconstruc-Tion继续工作仍在继续。

著录项

  • 来源
    《International Dredging Review》 |2019年第2期|58-58|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号