...
首页> 外文期刊>International Construction >A masterpiece of heavy lifting
【24h】

A masterpiece of heavy lifting

机译:繁重的杰作

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A heavy-lifting project in Vienna, Austria, has recently been completed by Austrian slipform and heavy lifting company Gleitbau. The Prater bridge in Vienna was erected during 1967-70. The section which crosses the Danube carries two three-lane carriageways on steel and concrete supports. The damming of the Danube in the course of constructing the Freude- nau power station meant that the Prater bridge had to be raised by up to 1.80m to provide an overhead clearance of 8m for shipping.
机译:奥地利滑模和重型起重公司Gleitbau最近在奥地利维也纳完成了一个大型起重项目。维也纳的Prater桥建于1967-70年。穿过多瑙河的路段在钢和混凝土支架上承载着两条三车道的行车道。在建造弗洛伊德瑙电站的过程中,多瑙河的大坝意味着普拉特大桥必须被抬高至1.80m,以便为运输提供8m的高架净空。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号