首页> 外文期刊>International Bulk Journal >AUMUND builds new cement works silo
【24h】

AUMUND builds new cement works silo

机译:AUMUND建立新的水泥厂筒仓

获取原文
获取原文并翻译 | 示例
           

摘要

Under the technical leadership of AUMUND Fordertechnik, the Cypriot cement producer, Vassiliko Cement Works, is constructing over the next 18 months an additional clinker silo with a capacity of around 100,000 tonnes, at its works close to the coastal town of Limassol. Vassiliko Cement has made considerable investments over the past ten years, installing a cement grinding plant with vertical mill, a kiln line with a capacity for 2mt/pa of clinker, and a clinker silo with a capacity of 100,000 tonnes. The plant was first established here in 1963, and Vassiliko has been operating it since 2011 with a kiln capacity of 6,000t/pd. Approximately 50 percent of the production is exported through its own port. Under a semi-turnkey contract covering the construction of the additional clinker silo, complete with conveyor bridges, transfer towers, superstructures, loading silos and supports, AUMUND is responsible for the technical organisation and coordination. Back in 2008 AUMUND had already won the order to supply conveying equipment for clinker.
机译:在AUMUND Fordertechnik的技术领导下,塞浦路斯水泥生产商Vassiliko Cement Works在接下来的18个月中,将在沿海小镇利马索尔附近建造一座产能为100,000吨的熟料仓。在过去的十年中,Vassiliko Cement已进行了相当大的投资,安装了带有立式磨粉机的水泥研磨厂,一条产能为2mt / pa熟料的窑炉生产线以及一条100,000吨的熟料仓。该厂于1963年在这里首次建立,Vassiliko自2011年以来一直以6000吨/日的窑产能进行运营。大约50%的产品通过自己的港口出口。根据一份涉及建造额外的熟料料仓的半总承包合同,其中包括输送机桥,输送塔,上部结构,装载料仓和支撑,AUMUND负责技术组织和协调。早在2008年,AUMUND就已经赢得了为熟料供应输送设备的订单。

著录项

  • 来源
    《International Bulk Journal》 |2016年第5期|19-19|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号