首页> 外文期刊>Inside the navy >Marine Corps' G/ATOR verifies system operations, C2 interoperability
【24h】

Marine Corps' G/ATOR verifies system operations, C2 interoperability

机译:Marine Corps的G / Ator验证系统操作,C2互操作性

获取原文
获取原文并翻译 | 示例
           

摘要

The Marine Corps' Ground/Air Task-Oriented Radar program verified system operations and command and control interoperability during testing this spring, a service spokeswoman told Inside Defense. Program spokeswoman Barb Hamby told Inside Defense Thursday that G/ATOR performed as expected during its test and evaluation event this spring at Naval Surface Warfare Center Dahlgren Division in Virginia. This testing "was primarily intended as a dry run to verify system operations and C2 interoperability," Hamby said. G/ATOR is a multirole, ground-based expeditionary 3D radar system and a critical program in the Navy's force design efforts, according to the service's budget documents. Testing took place over five weeks at Dahlgren, and included interoperability testing with other systems, according to a Marine Corps press release. Hamby said that testing was part of a number of G/ATOR testing and demonstration events the Marine Corps and Army have held since the second quarter of fiscal year 2021.
机译:海军陆战队的地面/空中任务为导向的雷达程序已验证系统操作和指挥和控制互操作在测试这个春天,服务发言人在防御内部讲述。节目发言人Barb Hamby于周四告诉内部防御,G / Ator在其在弗吉尼亚州海军地面战中心Dahlgren部门的春天的考试和评估活动期间进行。哈比说,这个测试“主要是作为干燥的运行以验证系统操作和C2互操作性。”根据该服务的预算文件,G / Ator是一个多拉,基于地面的远处3D雷达系统和海军的力量设计工作中的关键计划。根据海军陆战队新闻稿,在Dahlgren在Dahlgren进行了五周,并包括与其他系统的互操作性测试。哈比表示,测试是许多G / ATOR测试和示范事件的一部分,海军陆战队和陆军自20101年第二季度以来举行。

著录项

  • 来源
    《Inside the navy》 |2021年第36期|16-7|共3页
  • 作者

    Aidan Quigley;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号