首页> 外文期刊>Inside FERC >PJM can implement day-ahead scheduled reserves market, new capacity export charge
【24h】

PJM can implement day-ahead scheduled reserves market, new capacity export charge

机译:PJM可以实施提前预定的储备市场,新产能出口收费

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

In a trio of May 30 orders, the commission accepted PJM Interconnection's proposed day-ahead scheduled reserves (DASR) market as well as a capacity export charge, and granted an extension in the deadline for switching to an external market monitor.rnUnder terms of a settlement to restructure oversight of the grid operator's market (EL07-56, EL07-58) the current internal unit is breaking off as an independent company run by Market Monitor Joseph Bowring. An order approving the settlement set a June 1 date for the new monitoring regime, but in a May 12 motion, PJM President Terry Boston and Bowring said more time was needed (IF, 19 May, 10).
机译:在5月30日的三个订单中,委员会接受了PJM Interconnection的拟议日后预定储备(DASR)市场以及容量出口费用,并延长了切换至外部市场监控器的期限。解决方案,以重组对电网运营商市场(EL07-56,EL07-58)的监督,当前的内部部门正在分拆,成为由市场监督员Joseph Bowring经营的独立公司。批准和解的命令将新的监督制度定于6月1日,但在5月12日的动议中,PJM总统特里·波士顿和鲍林表示需要更多时间(IF,5月19日,10)。

著录项

  • 来源
    《Inside FERC》 |2008年第9期|9|共1页
  • 作者

    Craig S. Cano;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号