...
首页> 外文期刊>Infrastructure Asset Management >Water mains’ prioritisation for small to medium-sized utilities of Canada
【24h】

Water mains’ prioritisation for small to medium-sized utilities of Canada

机译:水管电源的优先级,加拿大中小型公用事业

获取原文
获取原文并翻译 | 示例
           

摘要

Ageing water infrastructure is a major concern for water utilities throughout the world. Due to lack of reliable data, it is challenging to develop an extensive water mains' renewal programme and predict the performance of water mains. Small and medium-sized water utilities are affected more due to the scarcity of data/information and lack of technical and financial resources. In this study, a life cycle costing (LCC) model is developed for small to mediumsized water utilities of Canada to prioritise repair, rehabilitation and replacement strategies of water mains. The proposed model will guide in establishing a practical and cost-effective renewal programme for new installations or for rehabilitation of damaged water mains. To validate the effectiveness of the LCC model, it is tested and implemented on a medium-sized water utility, namely Greater Vernon Water, British Columbia.
机译:老化水基础设施是世界各地的水资厂的主要关注点。由于缺乏可靠的数据,开发广泛的水管更新计划并预测水管的性能是一项挑战性。由于数据/信息的稀缺以及缺乏技术和财务资源,中小型水公用事业受到影响。在这项研究中,为小于加拿大的中型水公用事业而开发了生命周期成本(LCC)模型,以优先考虑水管的修复,康复和更换策略。拟议的模型将指导为新安装建立实用且具有成本效益的更新计划,或用于损坏的水管恢复。为了验证LCC模型的有效性,它在中型水实用程序中进行了测试和实施,即大紫龙水,不列颠哥伦比亚省。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号