...
首页> 外文期刊>IEEE Industry Applications Magazine >Monitoring Stator Insulation in Critical Motors: Choosing Diagnostic Tests
【24h】

Monitoring Stator Insulation in Critical Motors: Choosing Diagnostic Tests

机译:监视关键电动机中的定子绝缘:选择诊断测试

获取原文
获取原文并翻译 | 示例
           

摘要

The petrochemical industry has increasing interest in the condition monitoring of stator winding insulation during service. The factory acceptance specifications developed from the American Petroleum Institute (API) standards often require a partial discharge (PD) and/or power factor tip-up (PFTU) test for brand new windings as a factory acceptance test before installation. Petrochemical industry users often employ PD detection systems for the condition assessment of critical motors, but the use of the PFTU test as a periodic evaluation technique is less popular. Specialized resources are needed to perform these tests at the factory and in the field, imposing different technical demands and requiring expert data interpretation to ensure value for the end user. PD and PFTU may serve as complementary techniques and are most useful when data are trended through the machine winding service life. Both types of measurement depend on stator winding geometry, insulating materials, insulation system construction, and operating environment. This article explains the PFTU and PD tests as applied to both factory acceptance testing and field testing on installed machines, including setup and execution of measurements, and explores technical considerations to define an appropriate test regime to monitor insulation condition. Examples of PD and PFTU test data from factory acceptance of new stator windings and on-site measurements of installed machines are discussed.
机译:石油化学工业对服务期间定子绕组绝缘的状态监测越来越感兴趣。由美国石油学会(API)标准制定的工厂验收规范通常要求对全新绕组进行部分放电(PD)和/或功率因数增加(PFTU)测试,作为安装之前的工厂验收测试。石化行业用户经常将PD检测系统用于关键电动机的状态评估,但是使用PFTU测试作为定期评估技术的情况较少。需要专门的资源来在工厂和现场进行这些测试,这会产生不同的技术要求,并且需要专业的数据解释才能确保最终用户的价值。 PD和PFTU可以用作补充技术,在通过机器绕组使用寿命来趋势化数据时最有用。两种类型的测量都取决于定子绕组的几何形状,绝缘材料,绝缘系统的构造和工作环境。本文介绍了PFTU和PD测试,这些测试既适用于工厂验收测试,也适用于已安装机器的现场测试,包括测量的设置和执行,并探讨了技术因素,以定义适当的测试方案来监控绝缘状况。讨论了来自新定子绕组的工厂验收和已安装电机的现场测量的PD和PFTU测试数据示例。

著录项

  • 来源
    《IEEE Industry Applications Magazine》 |2014年第1期|50-55|共6页
  • 作者

    Stranges M.; Ul Haq S.; Vouk A.;

  • 作者单位

    GE Energy Power Conversion, Peterborough, K9J 7B5 Ontario, Canada|c|;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号