The project of setting up of Rail Coach Factory (Now Modern Coach Factory), at Lalganj Raebareli was sanctioned vide Pink Book item number 10 of Supplementary demands for grants in FY 2006-07 at an abstract cost of ¥1685.00Crores only "Setting up of Rail Coach Factory at Rae Bareli with a production capacity of 1000 Coaches per annum." The project is being carried out of nomination basis to M/s IRCON International for which Railway has entered into a contract with M/s IRCON International vide contract No. RCF/RBL (project) 2010/5 dated 16.07.2010. The detail estimate has been prepared by M/s IRCON based on the scope of work mentioned in the above contract. The detailed estimate cost was sanctioned by Railway Board at ¥2556.8 Cr. Further the Revised estimate made by M/s IRCON based on the additional requirement of MCF/RBL in Civil estimate as well as few in Mechanical estimate. The variation in Civil estimate is of ¥412.25 Cr. and in Mechanical estimate ¥99.46 Cr. which is 46.87% in Civil portion of detail sanctioned estimate and 9.62% in Mechanical portion of detail sanctioned estimate. The revised estimate was sanctioned by Railway Board in March '2016 at the ¥2973.30 Cr. for IRCON portion. For land estimate and other MCF/ RBL portion no revision was prepared as a result the total revised becomes ¥2973.30 + ¥218.71 Cr = ¥3192.01 Cr. The work is almost toward completion stage with target of Mar'2019.
机译:在Lalganj Raebareli设立铁路教练工厂(现为现代教练工厂)的项目在2006-07财年获得了粉红色图书补充补助金要求第10项的批准,抽象费用为¥ 1685.00千万。位于Rae Bareli的铁路教练工厂,年生产能力为1000辆教练。“该项目是根据M / s IRCON International的提名基础进行的,铁路已与M / s IRCON International的视频设备合同签订了合同2010年7月16日的RCF / RBL(项目)2010/5号。 M / s IRCON根据上述合同中提到的工作范围,编制了详细概算。铁路委员会批准了详细的估算费用,价格为2556.8人民币。此外,M / s IRCON根据民用估算中对MCF / RBL的额外要求而做出的修订估算,而机械估算中则很少。民事估算的变动为¥ 412.25铬。 Cr ¥ 99.46 Cr。占经批准细节的民事部分的46.87%,占经批准细节的机械部分的9.62%。修订后的估算值于2016年3月由铁路委员会以¥ 2973.30的价格通过了。用于IRCON部分。对于土地估算和其他MCF / RBL部分,未准备任何修订,因此总修订为¥2973.30 +¥218.71 Cr = ¥ 3192.01 Cr。该工作已接近完成阶段,目标是2019年3月。

著录项

  • 来源
    《Indian Railways》 |2019年第11期|74-75|共2页
  • 作者

    Alok Kumar;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号