首页> 外文期刊>Indian journal of power and river valley development >Boiler Drum Lifting Of Unit 1 Of Indira Gandhi Stpp Inaugurated
【24h】

Boiler Drum Lifting Of Unit 1 Of Indira Gandhi Stpp Inaugurated

机译:英迪拉·甘地·斯特普1号机组锅炉鼓式起重

获取原文
获取原文并翻译 | 示例
       

摘要

In a milestone development, the boiler drum lifting activity of unit one (500 MW) of Indira Gandhi super thermal power project, Jharli (Jhajjar in Haryana) was recently inaugurated by the Chief Minister of the State. The project with a capacity of 1500 MW (3 x 500 MW) is being set up by Aravali Power Company Private Ltd, a joint venture of NTPC Limited (50%), Haryana Power Generation Corporation Limited (25%) and Indraprashta Power Generation Company Limited (25%) with equity structure. The power generated from the project will be supplied to the beneficiaries Haryana and Delhi on 50:50 basis.
机译:在一项具有里程碑意义的发展中,国务总理最近宣布,英迪拉·甘地超级热电项目贾里(Jharli)(哈里亚纳邦贾贾尔)的一号机组(500 MW)的锅炉汽包提升活动开始。容量为1500 MW(3 x 500 MW)的项目由Aravali Power Company Private Ltd,NTPC Limited(50%),Haryana Power Generation Corporation Limited(25%)和Indraprashta Power Generation Company的合资企业建立。有股权结构的有限公司(25%)。该项目产生的电力将按50:50的比例提供给受益人哈里亚纳邦和德里。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号