首页> 外文期刊>IMSA Journal >News From Your IMSA Frequency Coordination Office: 800MHz Rebanding Underway FCC System Build-Out Requirements New FCC License Search Enhancements to ULS
【24h】

News From Your IMSA Frequency Coordination Office: 800MHz Rebanding Underway FCC System Build-Out Requirements New FCC License Search Enhancements to ULS

机译:IMSA频率协调办公室的新闻:800MHz重带正在进行中FCC系统构建要求ULS的新FCC许可证搜索增强功能

获取原文
获取原文并翻译 | 示例
           

摘要

The process of moving existing public safety licensees in the 800 MHz band is under way. The 800 MHz land mobile band is undergoing extensive reconfiguration in an effort to resolve interference problems that have been plaguing public safety systems in the band. As a result, many existing licensees, primarily those in the General Category and NPSPAC bands, will be required to retune their systems to alternative 800 MHz channel assignments (see IMSA Journal Nov/Dec 2004). The costs are being paid by Nextel Communications, Inc. The process began in late June for licensees in regions of the country that were assigned to "Wave 1" in the rebanding plan that was approved by the Commission.
机译:正在将现有的公共安全许可证持有者转移到800 MHz频段。 800 MHz陆地移动频段正在进行广泛的重新配置,以解决该频段中困扰公共安全系统的干扰问题。结果,将需要许多现有的被许可方,主要是通用类别和NPSPAC频段的被许可方,将其系统重新调整为替代的800 MHz信道分配(请参阅IMSA Journal 2004年11月12日)。这些费用由Nextel Communications,Inc.支付。该过程于6月下旬开始,针对该地区的被许可人,在委员会批准的重排计划中将其分配给“ Wave 1”。

著录项

  • 来源
    《IMSA Journal》 |2005年第5期|p.2022|共2页
  • 作者

    Alfred J. Mello;

  • 作者单位

    IMSA Frequency Coordination Office;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 公路运输;
  • 关键词

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号