首页> 外文期刊>The IES Journal Part A: Civil & Structural Engineering >Plug And Play Type Joints In Steel And Steel-concrete Composite Constructions: Development Guide And Design Considerations
【24h】

Plug And Play Type Joints In Steel And Steel-concrete Composite Constructions: Development Guide And Design Considerations

机译:钢和钢-混凝土复合结构中的即插即用型接头:开发指南和设计注意事项

获取原文
获取原文并翻译 | 示例
           

摘要

Traditionally, for countries in Western Europe, joints in steel frame structures are realised using bolts and welds. In the workshop, the components are made using welding end plates and attachments and drilling of the bolt holes. On site, these structural components are connected together using bolts and nuts. The activities on site mean a large physical effort of the steel construction workers who are not free from danger. Measures needed to ease the work and to make it safer for workers are increasingly expensive. There is a need to develop the so-called 'plug and play' connections which can be realised using remotely controlled techniques. The development of plug and play type joints is not only important to ease the work on site, but it can also reduce overall costs of the construction if the joint characteristics are taken into account at the design stage. Of the total costs of a steel structure, 50% of that amount is related to the joints whereas almost 90% of the total costs are already decided upon in the construction detailing phase. Optimisation in weight will not result in an optimal cost-efficient structure. Even semi-rigid and partial strength joints that result after the erection phase could lead to cost reduction. Some considerations are given to optimise the joint with respect to overall structural behaviour from a technical and economical point of view. Fast and safe construction methods with plug and play joints are required for the future. Structures need to be designed such that they are fit to be demounted and rebuilt easily. For these types of joints no specific design rules are available in Eurocode 3, Part 1.8: 'Design of joints' or in chapter 9 of Eurocode 4, Part 1.1: 'Composite joints'. This article describes the basis of design for these joints.
机译:传统上,对于西欧国家/地区,钢框架结构中的连接是通过螺栓和焊缝实现的。在车间中,零件是通过焊接端板和附件并在螺栓孔上钻孔而制成的。在现场,这些结构部件通过螺栓和螺母连接在一起。现场活动意味着无法摆脱危险的钢铁建筑工人的巨大体力劳动。减轻工作负担并使工人更安全所需的措施成本越来越高。需要开发可以使用远程控制技术实现的所谓“即插即用”连接。即插即用型接头的开发不仅对于简化现场工作很重要,而且如果在设计阶段考虑接头的特性,也可以降低施工的总成本。在钢结构的总成本中,其中50%与接头有关,而近90%的总成本已在施工详图阶段确定。重量的优化不会导致最佳的成本效益结构。甚至在安装阶段之后产生的半刚性和部分强度接头也可能导致成本降低。从技术和经济角度出发,考虑了一些考虑以优化接头的整体结构性能。未来需要使用即插即用接头的快速,安全的施工方法。需要对结构进行设计,以使其易于拆卸和重建。对于这些类型的接头,欧洲规范3,第1.8部分:“接头的设计”或欧洲规范4,第1.1部分:“复合接头”的第9章中没有特定的设计规则。本文介绍了这些接头的设计基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号