...
首页> 外文期刊>IEEE Transactions on Semiconductor Manufacturing >Optimal scheduling techniques for cluster tools with process-module and transport-module residency constraints
【24h】

Optimal scheduling techniques for cluster tools with process-module and transport-module residency constraints

机译:具有流程模块和传输模块驻留限制的集群工具的最佳调度技术

获取原文
获取原文并翻译 | 示例

摘要

This paper discusses two scheduling techniques for dual-arm cluster tools that address both process-module and transport-module residency constraints and throughput requirements. The first technique is the extension of our previous work that only addressed process-module residency constraints. For cases with long process times, this technique can take a long time to find the solution and is not practical. Hence, we use this algorithm mainly as a benchmark for comparison. The second technique that uses a linear programming technique with use of several heuristics can find the optimal solution very efficiently. Analytical and experimental analysis of this technique shows the correctness, completeness and efficiency of this technique.
机译:本文讨论了用于双臂集群工具的两种调度技术,这些技术可同时解决流程模块和传输模块的驻留限制以及吞吐量需求。第一项技术是我们先前工作的扩展,仅解决了流程模块的驻留限制。对于处理时间较长的情况,此技术可能需要很长时间才能找到解决方案,因此不切实际。因此,我们主要将此算法用作比较的基准。使用线性规划技术和多种启发式方法的第二种技术可以非常有效地找到最佳解决方案。对该技术的分析和实验分析表明了该技术的正确性,完整性和效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号