Staged Fault Tests with Single Phase Reclosing on the Winnipeg-Twin Cities 500 kV Interconnection

机译:在温尼伯-特温城市500 kV互连上进行单相重合闸的分阶段故障测试

获取原文
获取原文并翻译 | 示例

摘要

Staged line-to-ground fault tests were performed on the longest section of single-phase switched line in the world, the 528 km Dorsey-Forbes 500 kV line. Fault location and line loading conditions were varied for the nine fault tests applied and measurements were made of the primary and secondary arc currents and the arc recovery voltage. Arc extinction occurred rapidly with no restrikes during all of the tests. Secondary arc extinction occurred less than 50 ms after the beginning of the open phase deadtime. The remnants of the direct current offset in the fault current had a significant effect in delaying the secondary arc extinction.
机译:在世界上最长的单相开关线路528公里的多西-福布斯500 kV线路上进行了阶段性的线对地故障测试。对于九个故障测试,改变了故障位置和线路负载条件,并对一次和二次电弧电流以及电弧恢复电压进行了测量。在所有测试过程中,电弧迅速消失,没有任何残留。在缺相停滞时间开始后不到50毫秒内发生了二次电弧熄灭。故障电流中直流偏置的残留在延迟二次电弧熄灭方面具有显著作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号