首页> 外文期刊>Hydro review >A New Approach to Identifying Risk, Prioritizing Dam Safety Work
【24h】

A New Approach to Identifying Risk, Prioritizing Dam Safety Work

机译:确定风险,确定大坝安全工作重点的新方法

获取原文
获取原文并翻译 | 示例
           

摘要

Canadian utility Hydro-Quebec offers a new approach for identifying the factors that most contribute to overall risk, and using the results to prioritize dam safety work. It is impossible to predict risk with certainty because two of the main characteristics of risk are complexity and uncertainty. Even if a dam is judged to be safe, residual risk exists when people or property are in the flood zone. Dam failures, although not common, have serious consequences to people, property, and the environment. Therefore, establishing measures for reducing risk is an important responsibility of a dam owner.
机译:加拿大公用事业公司魁北克水电局提供了一种新方法,用于确定对总体风险影响最大的因素,并使用结果对大坝安全工作进行优先排序。确定风险是不可能的,因为风险的两个主要特征是复杂性和不确定性。即使大坝被认为是安全的,当人员或财产处于洪水区时,仍然存在残留风险。大坝倒塌虽然不常见,但对人员,财产和环境造成严重后果。因此,制定降低风险的措施是水坝所有者的重要责任。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号