首页> 外文期刊>Hydro review >Edmundston Energy receives $2 million for hydropower project
【24h】

Edmundston Energy receives $2 million for hydropower project

机译:Edmundston Energy获200万美元水电项目投资

获取原文
获取原文并翻译 | 示例
           

摘要

Edmundston Energy will receive up to C$2 million (US$1.9 million) from the Canadian federal government for a hydroelectric modernization project. The municipal power utility's 4.05-MW Madawaska Hydrodam project will be constructed by Norcan Hydraulic Turbine Inc. The plant will generate 20 GWh of electricity each year. "[The project] is helping create high-quality jobs and a sustainable energy source for New Brunswick's future," says Bernard Valcourt, Minister of State for the Atlantic Canada Opportunities Agency.
机译:Edmundston Energy将获得加拿大联邦政府高达200万加元(190万美元)的水电现代化项目资金。市政电力公司的4.05兆瓦Madawaska Hydrodam项目将由Norcan Hydraulic Turbine Inc.建设。该工厂每年将发电20 GWh。 “ [该项目]正在帮助为新不伦瑞克省的未来创造高质量的就业机会和可持续的能源,”加拿大大西洋省机会局国务部长伯纳德·瓦尔库尔特(Bernard Valcourt)说。

著录项

  • 来源
    《Hydro review》 |2012年第1期|p.168|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号