首页> 外文期刊>Hydro review >Adding Power to a Non-Powered Dam: Mahoning Creek
【24h】

Adding Power to a Non-Powered Dam: Mahoning Creek

机译:为无动力大坝供电:Mahoning Creek

获取原文
获取原文并翻译 | 示例
           

摘要

The U.S. Army Corps of Engineers (USACE) broke ground on Mahoning Creek Dam, a flood control structure that also provides recreational opportunities in the Allegheny River basin in western Pennsylvania, in 1939. By 1941, the concrete dam was finished. The design included a conduit that would allow the potential energy of water stored behind the dam to be used to produce hydroelectric power. However, the plans to develop hydropower at this dam were postponed due to steel shortages associated with the country's accelerating mobilization efforts for World War Ⅱ.
机译:美国陆军工程兵部队(USACE)于1939年在Mahoning Creek大坝破土动工,该大坝是一个防洪结构,也为宾夕法尼亚州西部的Allegheny流域提供了休闲娱乐的机会。到1941年,混凝土大坝建成。该设计包括一条导管,该导管将允许在大坝后面储存的水势能用于产生水力发电。但是,由于该国加快了第二次世界大战的动员力度,钢铁短缺导致该水坝的水电开发计划被推迟。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号