首页> 外文期刊>Hydro review >Renovation Marries History, Technology and Environment
【24h】

Renovation Marries History, Technology and Environment

机译:翻新结合历史,技术和环境

获取原文
获取原文并翻译 | 示例
           

摘要

Thirty miles from Seattle, in the foothills of the Cascade Mountains, flows Snoqualmie Falls, a magnificent 30-story cascading waterfall that attracts 2 million visitors each year. Hidden beneath this natural marvel lies a 115-year-old engineering marvel - the world's first underground hydroelectric power plant. Puget Sound Energy's (PSE) historic Snoqualmie Falls project is home to two power plants. Plant 1 was built in 1898 inside a bedrock cavity 260 feet below ground at the edge of the falls. The second powerhouse, Plant 2, a quarter-mile downstream from the falls, was built in 1910 and expanded in 1957. The facility is a vital piece of the company's generation and renewable energy portfolio. It's also been PSE's lowest cost power provider, but like many hydro plants around the U.S., it was showing its age. The plant needed upgrades to improve efficiency, capacity and safety.
机译:斯诺夸尔米瀑布(Snoqualmie Falls)距喀斯喀特山脉(Cascade Mountains)山脚下的西雅图30英里,是一座宏伟的30层级联瀑布,每年吸引200万游客。这座有着115年历史的工程奇迹-这是世界上第一座地下水力发电厂,被藏在这个自然奇观中。普吉特海湾能源公司(PSE)历史悠久的Snoqualmie Falls项目有两个发电厂。 1号工厂建于1898年,位于瀑布边缘地下260英尺的基岩空腔内。第二个发电站,即工厂2,位于瀑布下游四分之一英里处,建于1910年,并于1957年进行了扩建。该设施是公司发电和可再生能源产品组合的重要组成部分。它也是PSE成本最低的电力供应商,但与美国各地的许多水力发电厂一样,它也显示了自己的时代。该工厂需要升级以提高效率,产能和安全性。

著录项

  • 来源
    《Hydro review》 |2014年第3期|3032-33|共3页
  • 作者

    Paul Wiegand;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号