On Dec. 9 at 2300 hours, a transformer differential alarm was received and the Unit 3 generator tripped offline. Immediate investigation revealed failure of one of the C-phase standoff bushings in the 13.8-kV leads tunnel between the generator breaker and step-up transformer. Further investigation revealed rainwater intrusion through cracks in the concrete deck of the transformer yard. Calcium deposits were formed, copper grounding bars were oxidized, and other bushings and sections of the bus bar were wet.
机译:在12月9日的2300小时,收到了变压器差动警报,并且3号机组发电机脱机。立即调查显示,发电机断路器和升压变压器之间的13.8 kV导线隧道中的C相防脱套管之一发生故障。进一步的调查显示,雨水通过变压器堆场混凝土甲板中的裂缝侵入。形成了钙沉积物,铜接地条被氧化,其他套管和汇流条部分被弄湿。

著录项

  • 来源
    《Hydro review》 |2015年第3期|20-20|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:03:55

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号