首页> 外文会议>2012 IEEE IAS Electrical Safety Workshop >Case study of the failure of two 13.8KV control metering transformers that caused significant equipment damage
【24h】

Case study of the failure of two 13.8KV control metering transformers that caused significant equipment damage

机译:两台13.8KV控制和计量变压器故障导致设备严重损坏的案例研究

获取原文
获取原文并翻译 | 示例

摘要

The degradation and failure of cast-coil epoxy windings within 13.8kV control power transformers and metering potential transformers has been shown to be dangerous to both equipment and personnel, even though best industrial design practices were followed. Accident scenes will be examined for two events at a U.S. Department of Energy laboratory. Failure modes will be explained and current design practices discussed with changes suggested to prevent a recurrence and to minimize future risk. New maintenance philosophies utilizing partial discharge testing of the transformers as a prediction of end-of-life will be examined.
机译:事实证明,即使遵循最佳的工业设计规范,在13.8kV控制功率变压器和计量电势变压器中,铸线圈环氧绕组的退化和故障对设备和人员均具有危险。事故现场将在美国能源部实验室进行两次检查。将说明故障模式,并讨论当前的设计实践,并建议进行更改以防止再次发生并最大程度地减少未来风险。将研究利用变压器的局部放电测试作为寿命终止的预测的新维护原理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号