首页> 外文会议>IEEE IAS ELectrical Safety Workshop >Case study of the failure of two 13.8KV control metering transformers that caused significant equipment damage
【24h】

Case study of the failure of two 13.8KV control metering transformers that caused significant equipment damage

机译:两个13.8kV控制和计量变压器失效的案例研究导致了显着的设备损坏

获取原文

摘要

The degradation and failure of cast-coil epoxy windings within 13.8kV control power transformers and metering potential transformers has been shown to be dangerous to both equipment and personnel, even though best industrial design practices were followed. Accident scenes will be examined for two events at a U.S. Department of Energy laboratory. Failure modes will be explained and current design practices discussed with changes suggested to prevent a recurrence and to minimize future risk. New maintenance philosophies utilizing partial discharge testing of the transformers as a prediction of end-of-life will be examined.
机译:在13.8kV控制电力变压器和计量潜在变压器内的铸造线圈环​​氧绕组的降解和失效已被证明对设备和人员来说是危险的,即使遵循最佳工业设计实践。将在美国能源实验室的两项活动中审查事故场景。将解释失败模式,并采用所建议的变更讨论的当前设计实践,以防止复发,并尽量减少未来风险。将研究利用变压器局部放电测试作为预测寿命结束的新维护哲学。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号