The 285-foot-high Lower Baker Dam, which creates Lake Shannon on the Baker River in northwest Washington, was completed in 1925. The dam was built by Puget Sound Power & Light Company (now Puget Sound Energy or PSE) to provide electricity for the cement industry in the town of Concrete, Wash. At that time, the concrete arch dam impounded water for a powerhouse with a generating capacity of about 80 MW. In 2013, we added a 30-MW powerhouse to contain Unit 4. Design-build delivery of this new powerhouse was spawned by a need to improve flow releases for better movement of migratory salmon.1 Lower Baker Dam and hydro plant is part of the combined Baker River facilities, along with the 90-MW Upper Baker hydro project and dam, which were completed in 1959.
机译:285英尺高的下贝克大坝于1925年竣工,该坝在华盛顿西北部的贝克河上创造了香农湖。该大坝由普吉特海湾电力和照明公司(现为普吉特海湾能源公司或PSE)建造,用于为当时,华盛顿州混凝土镇的水泥工业用混凝土拱坝为发电量约80兆瓦的发电厂蓄水。 2013年,我们增加了一个30兆瓦的动力装置,以容纳第4号机组。由于需要改进流量释放以更好地迁移鲑鱼,因此产生了该新动力装置的设计建造交付。1下贝克大坝和水力发电厂是其中的一部分。结合了贝克河的设施,以及90兆瓦的上贝克水电项目和大坝,这些工程于1959年完工。

著录项

  • 来源
    《Hydro review》 |2016年第8期|242628-29|共4页
  • 作者

    Robert Romocki;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:03:35

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号