首页> 外文期刊>Hydro Review Worldwide >Impregilo to build South Africa's 1,368-MW Ingula
【24h】

Impregilo to build South Africa's 1,368-MW Ingula

机译:Impregilo将建造南非的1,368兆瓦口

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

South African utility Eskom named Impregilo and CMC of Italy to build the 1,368-MW In-gula pumped-storage project on the border of South Africa's Free State and KwaZulu-Natal.rnImpregilo announced March 31 that it has a 40 percent interest in the construction consortium to build the 600 million euro (US$792.6 million) pumped-storage project in the Little Drakensberg Mountains near Ladysmith. Completion is scheduled for 2013.rnImpregilo and its partners are responsible for underground civil works, including installation of pump-turbines, underground waterways, leveling shafts, penstocks, powerhouse and transformer caverns, access tunnels, and upper and lower reservoirs.
机译:南非公用事业公司Eskom任命Impregilo和意大利CMC在南非自由邦和夸祖鲁-纳塔尔省的边界上建设1368兆瓦的In-gula抽水蓄能项目。rnImpregilo于3月31日宣布,它在该建设中拥有40%的权益财团将在Ladysmith附近的Little Drakensberg山区建造一个耗资6亿欧元(7.926亿美元)的抽水蓄能项目。 Immpregilo及其合作伙伴负责地下土建工程,包括泵水轮机,地下水道,水准井,压力管道,动力厂房和变压器洞穴,通道隧道以及上下水库的安装。

著录项

  • 来源
    《Hydro Review Worldwide》 |2009年第2期|6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号