...
首页> 外文期刊>Hydro Review Worldwide >Reopening Glendoe after a Rockfall
【24h】

Reopening Glendoe after a Rockfall

机译:崩塌后重新开放格伦多

获取原文
获取原文并翻译 | 示例

摘要

One of the first significant hydro plants to be built in the UK in decades, the 100 MW Glendoe was shut down just eight months after start up as a result of rock falls partially blocking the main water conveyance tunnel. With repairs now almost complete, the station is expected to recommence operations as HRW goes to press.
机译:100 MW的Glendoe是英国数十年来首批重要水力发电厂之一,在启动后仅八个月就关闭,原因是岩石坠落部分堵塞了主要的输水隧道。由于维修工作现已接近完成,预计车站将在HRW付印之时重新开始运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号